Week 1

3/6/2023 Monday

  • Greenscope
    • Indicators
      • Fixed the check all JS.
      • Added in Js so that the Symbols work now.

3/7/2023 Tuesday

  • Greenscope
    • Best worst
    • Fixed The Manual Entry needed to not make input box too small.

3/8/2023 Wednesday

  • Greenscope
    • Results
      • Numerical section works.
      • Graphical section does not work for either project.
      • Started to look into where the JS for graphical is but switched to Project summary.
    • Project Summary
      • Summary
        • 12 Tables are showing up there are a few that are not and need to be tested still.
      • Report
        • This page is working.
        • Formatted Checkboxes with Headers.
        • There is a dropdown box with only 1 format aka excel.
        • The excel file is created and is in my downloads directory.

3/9/2023 Thursday

  • Greenscope
    • Basic Information page.
    • Reference Conditions.
    • These pages were skipped because they were a challenge at first.

3/10/2023 Friday

  • Greenscope
    • Finished up Compound details
    • Change the economics/costs/ from int to .01 ProjectEconomicsCostFactorsView
    • Change the utilities renewability from int to .01 ProjectUtilityRenewabilityView
    • Updated the tasklist for Greenscope project along with a project estimation.